目 录
一、编制依据Reference 4
1.1编制说明Intro 4
1.2编制依据Reference 4
二、工程概况General Info 6
三、人员、机具安排Mobilization of Equipments and Manpower 7
3.1项目组织机构图Site Organization Structure Chart 7
3.2作业人员配备情况一览表labor configuration table 8
3.3机具配备情况一览表equipment configuration schedule 8
四、施工方案Construction Plan 9
4.1安装总体思路General Idea of the Construction Job 9
4.2工艺流程图Work Flow 10
4.3施工准备 11
4.4钢结构拼装S.S assembling 14
4.5结构吊装erection of structure 24
五、高强螺栓施工艺HSB Technique 40
5.1 一般规定 General requirement 40
5.2安装前的检查工作inspection work before installation 42
5.3质量标准 Quality standard 51
5.4应注意的质量问题 Quality issues with attention required 54
5.5质量记录 Quality record 55
六、测量施工工艺Surveying Technique 55
6.1测量工作流程Flow Chart for Survey 56
6.2测控网的建立establishment of measure control net 56
6.3沉降观测settlement observation 60
6.4测量精度保证措施Measures to ensure accuracy 61
七、垫板、二次灌浆工艺 61
7.1垫板工艺要求 the requirement for the shim plate process 62
7.2二次灌浆施工艺 construction process the second time grouting 63
7.3养护Maintains 63
八、防腐涂装方案Anticrrosion Painting Plan 64
8.1涂装工艺Painting Process 64
8.1.2.4构件表面处理Member Surface Treatment 67
8.1.2.5油漆修补涂装Repairing Paint 68
8.2质量控制和质量保证措施Quality Measures 70
8.3安保措施 Safety Measures 72
九、安全技术措施safety measures; 73
9.1钢管脚手架steel tube scaffold 73
9.2生命绳Life line 88
9.3活动操作架台movable scaffold platform 90
9.4笼梯cage ladder 92
9.5挂笼safety cage 97
9.6吊笼lifting cage 100
十、安全管理措施safety measures 107
10.1作业人员的管理 Management of Operation Personnel 107
10.2机具管理 Management of Machinery and Tools 108
10.3临时用电的管理 Management of Temporary Electricity Supply 108
10.4脚手架的管理 Management of Scaffold 108
10.5进场道路的管理 Management of Entering Road 109
10.6劳防用品的管理 Management of PPE 109
10.7风险预知管理Risk Prediction Management 109
十一、工作风险分析表-JRA 109
一、编制依据Reference
1.1编制说明Intro
本施工方案针对Team D管架钢结构工程编制,我司承担的Team D管架工程分为24段管架,总长近1.3公里,钢结构总量近3800吨;管架宽度分别为2m、3m/3.5m、4m、6m、7m和8m,管架高度最高为22.1米。鉴于结构型式简单,施工方法相近,仅是在吊机选型上有所不同,为此我们将其中最具代表性的21a管架作为典型,来编制此施工方案,其它管架(R20a、R20b、R20c、R20d、R20e、21a、R22a、R22b、R22c、R23、R24a、R24b、R25a、R25b、R25c、R26、R33a、R33b、R33c、R34、R36)的施工参照此方案。
This construction plan is compiled as per actual site situation of pipe rack in Team D and is only applicable for installation of steel structure pipe racks. Since the project consists of 24 pipe racks which is 1.3 KM long and 3800 tons. Width of pipe racks are 2m、3m/3.5m、4m、6m、7m and 8m, highest part of pipe rack is 22.1 meter high. Structure type is simple and the installation method is the same with other areas. Here we will take the most difficult pipe rack, 21a, as an example to compile construction method. Other pipe racks (R20a、R20b、R20c、R20d、R20e、21a、R22a、R22b、R22c、R23、R24a、R24b、R25a、R25b、R25c、R26、R33a、R33b、R33c、R34、R36)share the same method.
1.2编制依据Reference
1.2.1本工程招标文件;
The bid document for the project
1.2.2道康宁公司相关技术标准、规范及管理程序;
The Dow Corning’s relevant technique standard, the specification and management program.
1.2.3东洋工程公司相关管理程序、技术标准;
Toyo Engineering Corporation’s relevant management program and technique specification.
1.2.4江苏省及张家港地区现行的相关地方标准、规范;
The relevant location standard and specification which belongs to Jiangsu province and Zhangjiagang area.
1.2.5.宝冶建设有限公司相关管理程序及企业标准
Baoye Construction Corp., Ltd.’s management program and standard
1.2.6国家现行的相关标准及规范,部分摘录如下:
Relevant GB codes and specifications, as following:
《建筑工程设计文件编制深度规定》2003版;
《Construction engineering design document》-2003
《建筑结构可靠度设计统一标准》GB 50068-2001;
《Construction structure standard》-GB 50068-2001;
《建筑结构荷载规范》GB 50009-2001;
《Construction structure load specification》-GB 50009-2001;
《钢结构设计规范》GB50017-2003
《Steel Structure Designing Specification》GB50017-2003
《钢结构防火涂料应用技术规程》CECS 24-90
《Steel structure fire retardant coating application technology point of order》CECS 24-90
《碳素结构钢》GB /T 700-88
《Carbon Structural Steel》GB /T 700-88
《大六角头螺母,垫圈等技术条件》The large hexagonal nut, washer, and other technical conditions《钢结构工程施工质量验收规范》 GB 50205-2001
《Steel Structure Project Construction Acceptance Specification》(GB50205-2001)
《建筑钢结构焊接技术规程》JGJ81-2002
《Architectural Steel Structure Welding Technology Specification》JGJ81-2002
《钢结构高强度螺栓连接的设计、施工及验收规范》 JGJ 82-91
《Steel Structure High Strength Bolt Designing, Construction and Acceptance Specification》(JGJ82—1991)
《石油化工企业设计防火规范》 GB 50160-92 (1999年版)
《Petrochemical companies code for fire protection design》GB 50160-92 (1999)
《建筑施工扣件式钢管脚安全技术规程》GBJ130-2001
《Technical code for safety of steel tubular scaffold with couplers in construction》GBJ130-2001
二、工程概况General Info
21a全长94.8米(轴线到轴线),宽度7米(轴线到轴线),高度20米,最大跨距15米,最小跨距3.8米,共11条轴线,总重量约600吨。东侧与一期老管架相连,西侧与中核二三承建的管架相连,北侧为中建二局在建项目,南侧为张家港路,道路条件良好。但施工区域内拼装作业面狭小,且紧挨21a管架南侧有水沟在施工中,对拼装吊装、吊机站位带来了诸多的不便。
21a is 94.8 meters long (axis to axis), 7 meters wide, 20 meters high and with 11 axes and about 600 tons steel structure. The span ranges from 3.8 meters to 15 meters. The east p
因本站资料资源较多,启用了多个文件服务器,如果浏览器下载较慢,请调用迅雷下载,特别是超过了5M以上的文件!请一定调用迅雷,有时候速度就会飞起哦,如果您的浏览器自动加载了PDF预览,文件太大又卡死,请按下载说明里的把PDF插件关闭了就可以直接下载,不会再预览了!