瀑布沟水电站砾石土心墙堆石坝设计
余学明.何 兰
(中国水电顾问集团成都勘测设计研究院,四川成都 610072)
摘 要:瀑布沟水电站大坝,根据坝址区地形地质条件,采用砾石土直心墙堆石坝,最大坝高186 m,坝基覆盖层
最大深度为77.9 m,具有“坝高、基础覆盖层深厚、防渗土料复杂”等特点。经大量的设计研究工作,选择的坝线
和采取的坝体结构、基础防渗处理措施及采用的筑坝材料等,较好地适应了这些特点,保证了大坝安全可靠运行。
关键词:砾石土心墙堆石坝;结构设计;瀑布沟水电站
Design of Gravel Soil Core W all Rockf'dl Dam of Pubugou Hydropower Station
Yu Xueming,He Lan
(HydroChina Chengdu Engineering Corporation,Chengdu Sichuan 610072)
Abstract:The Pubugou dam was designed as a gravel soil vertical core wall rockfill dam with a maximum height of 1 86 m
according to topographic and geologic conditions of dam site.The maximum overburden depth of dam foundation is 77.9 m.
The dam axis,dam structure,foundation seepage control measures and dam construction material was analyzed in detail in
the design of dam.The results show that the design is reasonable and feasible.
Key W ords:gravel soil core wall rockfill dam;structural design;Pubugou Hydropower Station
中图分类号:TV641.41(271) 文献标识码:A 文章编号:0559—9342(2010)06—0039—04
1 工程概况
瀑布沟水电站是一座以发电为主。兼有防洪、
拦沙等综合利用效益的大型水电工程。工程枢纽主
要由拦河大坝以及泄水、引水发电、尼日河引水入
库等永久建筑物组成。左岸布置引水发电建筑物及
1条岸边开敞式溢洪道、1条深孑L无压泄洪洞,右岸
布置1条放空洞和尼日河引水入库隧洞。拦河大坝
为砾石土心墙堆石坝, 坝顶高程856.00 in, 坝顶宽
14 in、长540.50 in。大坝最低建基面高程670.O0
in.最大坝高186 in。拦河大坝的抗震设防类别为甲
类,抗震设防烈度为8度。
2 坝址区工程地质条件
坝址区位于瓦山断块西侧大渡河由南北向急转
为东西向的“L” 形河湾段。河谷两岸山体雄厚,谷
坡陡峻, 自然坡度为35o-45。。左岸为凸岸,地表无
深切沟状水系切割, 山顶面较高, 山体雄厚;谷坡
形态呈上缓下陡的折线形.在860 in 高程以下谷坡
相对较陡.坡度多在450 55。之间,860 in高程以上
谷坡为河流Ⅳ 级阶地和早期古河道堆积, 地势宽缓,
地形坡度小于30。。右岸为凹岸. 由于尼Et河和卡
尔沟切割, 山顶面相对较低, 山体单薄, 谷坡坡度
多在45。以上。
瀑布沟水电站拦河大坝为砾石土心墙堆石坝。
坝轴线方向为N29。E。在河床中间偏左位置发育有
F 断层,F2断层以N30。W 向斜切河床穿过坝基。以
断层为界,左岸及下游河床为中粗粒花岗岩,右岸
大部及上游河床为浅变质玄武岩。
心墙区左岸坝基高程为670~810 in. 建基面岩
性为花岗岩夹少量辉绿岩脉。边坡岩体总体上呈镶
嵌、次块状结构, 以Ⅲ 类围岩为主;仅桩号坝0—
008~坝0+097、750~810 in 高程范围内的强卸荷岩
体呈块裂、碎裂结构,为Ⅳ类围岩。
心墙区右岸坝基岩性主要为浅变质玄武岩。岩
体风化、卸荷程度总体随着高程的降低而逐渐减弱,
边坡岩体总体上以碎裂、镶嵌结构为主,730~810
in高程区段为Ⅲ 类围岩,670~730、730~856 in高程
收稿日期:2010—04—19
作者简介:余学明(1962一),男, 四川成都人, 教授级高工,主
要从事水电站水工设计工作.
Water Power Vo1.36.No.6圈