玛纳斯河一级水电站引水隧洞的
设计与施工
周吉军
(新疆生产建设兵团勘测规划设计研究院,新疆石河子832000)
摘耍:在第四纪弱胶结地层中建造较大断面的无压隧洞, 国内的工程实践经验并不多。建造在第四纪西域砾岩
(Q )地层中的新疆玛纳斯河一级水电站引水隧洞,在勘测、设计、施工等方面的经验,可供类似工程参考。
关键词:第四纪地层;隧洞;玛纳斯一级水电站
Design and Construction of the Diversion Tunnel for Manas River I Hydropower Station
Zhou Jijun
(Planning,Design and Research Institute of Xinjiang Production and Construction Corps,Shihezi 832000,Xinjiang,China)
Abstract:Constructing non-pressure tunnel with larger cross section in Quaternary weakly—cemented stratum is rare in
China.The diversion tunnel of Manas River I Hydropower Station is constructed in the Quaternary conglomerate(Q1)in
Xinjiang.The investigation,design and construction of the tunnel are introduced herein and the experiences can be as
references to similar prujects.
Key Words:Quaternary stratum;tunnel;Manas River I Hydropower Station
中图分类号:TV672.1(245) 文献标识码:B 文章编号:0559—9342(2011)02—0038—02
1 工程概况
新疆玛纳斯河是一条山溪性内陆河,源自天山
北坡,注入准噶尔盆地,坡陡流急,水能蕴藏量丰
富。山区集水面积4 367 km , 多年平均流量38.5
m3/s
, 玛纳斯河一级水电站是规划的10个梯级电站
中的第四级, 为引水式电站, 主要由引水枢纽、引
水明渠、隧洞、前池、厂房等建筑物组成。电站设
计水头104 m. 发电引水流量62 m3/s. 装机容量50
MW ,设计年发电量1.89亿kW ·h. 总投资3.85亿
元。工程于2005年3月动工,2006年10月首台机
组正式投产发电。
该电站引水线路长12 km, 地形地质条件复杂,
其中穿越第四纪地层的4 km隧洞是设计与施工的难
点之一。
2 隧洞沿线地形地质条件
2.1 地形条件
水电站引水工程位于玛纳斯河中游河段的低山
丘陵区内, 河流下切深度70~130 l?q, 河谷宽阔平
圄耍 Water Power Vo[.37No.2
坦.呈“U”形谷地,河岸多陡立,形成数十米至百
米的悬崖峭壁,河床纵坡约0.8% .河谷两岸为不对称
阶地地貌 在引水线路前段有4 km长的高陡河岸,
相对高差80 m 以上,而且分布有多条较大的冲沟,
如果修建盘山明渠, 为保证岸坡稳定,必须将近乎
直立的岸坡削成稳定边坡, 即使边坡坡比取为1:0.5,
土石方开挖量仍非常大,很不经济,且运行中极容
易发生边坡垮塌堵塞渠道, 很不安全, 因此设计人
员提出了在第四纪地层中开凿隧洞的设计方案。
2-2 地质条件
南于国内在第四纪地层中开挖断面面积达到30
m 以上的隧洞并不多见, 为了稳妥起见,对沿线地
质构造、地层岩性及物理力学性质、地下水位情况
作了全面勘察, 勘测阶段共打勘探洞6条,进行了
多种现场试验. 得到分析成洞条件、确定施