4 结语
300 Mw 机组热风门改造前,2004年全年总
故障数为12次,其中磨煤机正常运行中,热风门
误动、热风挡板关至零、给煤机转速到最小的故障
次数为8次。改造后(2005年7~ 12月)热风门
总故障数为2次,其中磨煤机正常运行中,热风门
误动、热风挡板关至零、给煤机转速达最小的故障
发生1次。
通过此次改造,检修人员的技术水平有了提
高,同时也推动了检修质量的提升。不但保证了
磨煤机的正常运行,而且保证了给煤机的正常出
力,从而确保了机组满负荷运行。
收稿日期:2007 12 14
作者简介:王友嘉(1 980),男,天津人,本科,从事热控
FSSS系统工作;陆勇毅(1972),男,上海人,本科,从事发
电厂热控FSSS 系统工作。
(责任编辑:杜建军)
Hot air gate faults analysis for 300 M W power generation units
WANG You—jia ,L己,Yong—yi
(Wujing Power Generation Co.,I td.Shanghai Electric Power Co.,Ltd.Shanghai 200241,China)
Abstract:After the analysis and the investigation tO the faults of the 300M W unit pulverizer hot air gate control system 。
the paper introduced the application of the hot gate control system in power plants based on the technical specification,the
system constitution and the system principle.The main reasons which influence the generator output power are also ana—
lyzed.To ensure the generator be running with the full load under the electricity peak,the improvement counterm easures
with software and hardware technology are introduced.The practice proved that。if anti—disturbance problems induced by
high temperature and different kinds of disturbances cannot be settled very well,computer control system will not run
normally,and it will lead to serious faults or heavy loss.
Key w0rds:pulverizer;hot air gate;solenoid valve;magnetism switch;PLC
贵州院运用排水法开展输电线路覆冰测量
据《电力试研消息))2008年2月25日报道:2月14日,为采集好覆冰厚度、重量、尺寸等各种数据
和线路受损情况,以便为贵州电网灾后修复提供设计、加固、重建的依据,贵州电力试研院派出专家组,前往六盘水供电
局输电线路,开展覆冰冰样采集和分析T作。
排水法测量输电线路的等值覆冰厚度,是在现场测量出导线实际覆冰厚度后,通过排水法测量出线路覆冰的实际密
度,然后将导线的覆冰厚度折算为标准厚度,有着较好的科学性和准确性,这在贵卅I电网从事尚属首次。
贵州院及时购买了测试所需仪器和采样器皿,于2月14日晚间赶到110 kV水杨白西线事故抢修点进行冰样采集。
取样完成后回到临时测量点,取样、测量、倒水,按照要求顺利完成了首次线路覆冰冰样的测量工作。
此次测量工作的完成,为排水法测量在贵州电网的实际推广运用奠定了基础,为下一阶段贵州电网线路的恢复性建