摘 要:钢筋混凝十楼板超长结构设置伸縮縫是基于混凝土收缩、热胀冷缩和地基的不均匀沉降的因素。结构留缝与否,
土楼板无缝结构施工要考虑的主要问题是由变形引起的裂缝,应采取有效措施控制裂缝。
关键词:超长;无缝结构:施工案例
中图分类号:TU755
文献标识码:B
文章编号:1006—2572(2010)03—0078-03
Case Study on Seamless Structure of Super-long Steel Concrete Floor
Xiong Feng, Dong Xusheng, Zhang Qianwen
(Jiangxi Coalfield Geology Bureau, Nanchang, Jiangxi 330001)
Abstract;Setup expansion joint for steel concrete floor super - long structure based on concrete shrinkage, ther-
mal expansion and contraction and uneven settlement of foundation, Structure joint or not isnt the only conditior
of structure deformation of cracking, and there are many cracking factors. The main problem of seamless struc
ture construction of super-long steel concrete floor is the crack caused by deformation, so effective measures of
control crack should be taken,
Key words:super-long ; seamless structure;project case
1
工程概况
长钢筋混凝土结构施工中,一般每30m~40 m 设一道后
浇带,等40~50天后浇膨胀混凝土,这种常规后浇带施
江西某高校二期教学楼工程,由中煤公司组织施工,
建筑面积12623m’,建筑檐高24.50m,框剪结构六层,人工
工,由于其延长工期,钢筋断后的搭、焊接和清理凿毛均给
填缝施工带来一定麻烦。处理不好将会留下隐患。我们
挖孔灌注桩基础,分南北两主楼,主楼南北向长 53.40m;
东西向长 81.17m(见图 1),钢筋混凝土楼板设计厚度
在工程施工实践中,利用UEA混凝土补偿收缩的原理,采
11cm,屋面板厚度 12cm,混凝土设计强度C30,商品混凝
用膨胀加强带替代后浇带,实现了超长无缝结构的施工,
土施工工艺,混凝土浇注量约 6000m’。由于合同工期为
为同类工程施工提供了可借鉴的经验。
2005年2月19日至8月30日,考虑桩基施工和桩基检测
等因素该工程工期非常紧张,同时出于结构整体性和屋面
防水要求的考虑,中煤公司提出采用并编制了超长楼板结
构无继施工方案,经参建各方研究决定由原设计后浇带变
更为采用一次连续浇注成型的无缝实施方案。
2 .裂缝的分析与施工处理
结构长度是影响温度应力的因素,为了消减温度应
力,取消伸缩缝,在施工中采用施工后浇带可有效地减少
温度收缩应力,然后再浇灌后浇带使结构成整体。只要使
浇灌后浇带前及浇灌后浇带后,结构混凝土因温差和收缩
图 1 有防水要求的UEA无缝设计示意图(立面)
应力叠加值小于混凝土抗拉强度,这就是利用“施工后浇
带”办法控制裂缝,达到不设置永久伸缩缝的目的。但超
3 设计技术措施