摘要:在对某47层框筒结构高层建筑检测时,发现其第1至第5层有部分混凝土柱强度不足,但由于客观条件限制,又
不允许采取加固处理。经过分析研究,只能在不影响主体结构的情况下,用局部替換的方法进行补强施工。经工艺优
化,在混凝土柱托換施工后,经其检测,结果能够满足国家规范要求。其所积累经验,可供类似工程參考。
关键词:高层建筑 框筒结构 混凝土墙柱托换 补强 有限元分析
中图分类号:TU756.1
文献标识码:B
文章编号:1004-1001(2014)10-1125-03
Construction Technology for Underpinning of Concrete Wall and Column in
Super High-Rise Building Frame-Tube Structure
Wang Wenming
China Construction Seventh Engineering Bureau(Shanghai) Corp., Ltd.Shanghai 201812
Abstract: The examination of a 47-storey frame-tube structure showed that the strength of partial concrete columns from
the first to the ffth floor was not hiqh enough. Due to the limitation of obiective condition, reinforcement treatment was
without affecting the main structure.After underpinnina construction, concrete columns had been tested to meet the
national standard. The accumulated experience can provide reference for similar projects.
Keywords: super high-rise building
frame-tube structure
concrete column underpinning
reinforcement
finite element analysis
工程概况
数量多(图1)。托换方案存在很大的风险,采用的支撑体
某工程为地下3层、地上47层的框筒结构高档住宅,
系设置毕竟和原来的结构不是一个整体,如果设计不当,
星顶结构标高160 m,底层高4.60m,标准层高3.30 m,
将会给永久结构带来裂缝、变形或更大的事故。由于混凝
1~2层间有一夹层,夹层高3.20m,平面长37.65 m,宽
土柱为劲性混凝土,拆除柱时要整体替換,即核心区混凝
20.20 m。18 层以下柱混凝土强度C60,梁板混凝土强度
土也要替换,使本来固结的节点变成铰接,很容易形成机
C30,地下3层至地上4层柱为劲性混凝土柱。
动体系,引起失稳。
在主体结构施工至第10层时,对混凝土柱结构进行检
则,发现1~5层部分墙柱混凝土强度不足,如果不采取处
理措施可能会造成房屋安全隐患。
由于墙柱混凝土强度不足,主要补救措施可采用拆
®
徐、加固和托换等3种方法进行施工。由于客观条件限
制,不允许采取加固处理,因此只能在不影响主体结构的
®
情况下,用局部替换的方法进行施工。但是对于墙柱托换
e
施工而言,技术难度较大,且托换加固后能否保证结构的
图11-5层托換混凝土柱平面布置
安全度达到理想效果均存在风险。
2.1 临时支撑体系
2 托换方案设计
假定支撑体系杆件与原结构连接均为铰接,在混凝土
根据检测数据分析,托换混凝土墙柱的数量为19 根,
凿除以后,由于钢筋相连,设为铰接。且不考虑环梁等的
加固作用。临时支撑采用壁厚1cm的q400 mm钢管,拆除
支撑体系设计如图2所示。
作者简介:王文明(1979—),男,本科,工程师。
通讯地址:上海市嘉定区曹安公路3055号(201812) .
2.2 计算分析
收稿日期:2014-08-26