库壁与直形挡墙同步施工的滑动模板构造体系,库底板以上部位采用适合单仓施工的库壁渤动模板技术体系,.........造方面,实现两种
关键词: 一体化施工;统筹设计;相互转换
中图分类号:TU528.59
文献标志码:A
文章编号: 1002-3550(2011)06-0159-03
Large diameter silos and library top steel structure integration slippery rise construction
TANG Zhi-qiang.YAO Li-guo.LIU Rui-cai
(Hebei No.4 Constnuction Engineering Company,Shijiazhuang 050051,Chin
Abstract:Silo cnginecring library wall slippery nise template system and library wall slippery rise lemplate structures and fetaining straight
form integrated constn of templale system ibrary.overall desibrary floor followith straight rctall of sliding si-
multancous construction of fractal structure svstem . the library floor template for more parts adopt single warehousc construction library wall
formwork technology system ,in slide template tectonically ,reatc tcctonic compatible and mutual conversion,coopcrate with the rea-
towage construction.
Key words: integration construction;overall desi:mutual conversion
1 工程概况
2 施工方法
山东淄博市淄川区宝山水泥厂5000 Ud新型千法水泥熟
按传统施工工艺施工熟料储存库筒仓库壁与库内挡墙结构,
料生产线项目,包括石灰石破碎 ,煤破碎、石灰石堆场、原煤堆
是在施工完库体筒仓后进行直挡墙施工,通常采用满堂脚手架
场、原煤输送、原料及烧成系统中的原料配料、原料粉磨、生料
绑扎钢筋,分步支设模板,用对拉螺杆加固,再分段浇筑混凝土
均化库、窑头、窑中、窑尾、煤粉制备、总控、熟料输送储存、生料
的施工工艺。为了缩短施工工期、提高施工质量、降低施工费用,
配电、窑中配电站等。其中熟料熟料输送储存库工程为筒仓结
采取了熟料库筒仓库壁及库内挡墙一体化滑升施工方法。
构,简仓内径为40m,高46.92m,仓壁厚550 mm;仓壁钢筋水
将简仓工程库壁滑升模板体系和库壁滑升模板构造及直
平筋 巾22@120 mm,竖向筋 巾20@250 m.库内挡墙高 10 m,
形挡墙模板系统进行一体化施工的统筹设计,在库底板以下部
厚500mm,钢筋水平筋 Φ18@250 mm,竖向筋 t22@250 mm。
位,采用库壁与直形挡墙同步施工的滑动模板构造体系,库底
熟料库结构形式见图 1。
板以上部位采用适合单仓施工的库壁滑动模板技术体系,在模
板构造方面,实现两种模板构造的兼容和相互转换,配合合理
的施工工艺和作业方法,完成简仓库壁和仓体结构有拖带或无
库顶板
拖带施工。
3 施工工艺流程及操作要点
3.1 施工工艺流程
熟料库底板
简仓滑模设计一库壁与库内直形挡墙滑模组装一库底板
库壁
以下部位库壁和直形挡墙同步施工一空滑作业,库底板施工一
-库内直形墙
主0.000
直形挡墙滑模与库壁滑模分离一库壁滑模系统转换一库壁
图 1 熟料库结构形式
施工。