Foreword
Introduction
Scope
Nomative references
Definitions
4
Execution management
4.1
Assumptions
4.2
Documentation
4.2.1
Execution specification
4.2.2
Quality Plan
4.2.3
Execution record documentation.
4.2.4
Special record documentation
4.3
Quality Management.
4.3.1
Execution classes
4.3.2
Inspection of materials and products
4.3.3
Inspection of execution
4.4
Action in the event of a non-confomity
5
Falsework and formwork
5.1
Basic requirements
5.2
Materials
5.2.1
General
5.2.2
Release agents
5.3
Design and installation of falsework
5.4
Design and installation of fomwork
5.5
Special formwork
5.6
Inserts in fomwork and embedded components
5.6.1
General
5.6.2
Making good of temporary recesses and holes
5.7
Removal of formwork and falsework
6
Reinforcement
6.1
General
6.2
Materials
6.3
Bending, cutting, transport and storage of the reinforcement
6.4
Welding
6.5
Joints
7
Prestressing
7.1
General
7.2
Materials for prestressing
7.2.1
Post-tensioning systems
7.2.2
Sheaths
7.2.3
Tensile elements
7.2.4
Anchorage elements and accessories
7.2.5
Tendon supports
7.2.6
Cement-based grout
7.2.7
Grease, wax or other products
7.3
Transport and storage
7.4
Installation of tendons
7.4.1
General