摘要:蜀河水电站厂房坝段混凝土施工采用已修建的右岸泄洪闸进行二期导流,需在厂房基坑上、下游修建横向挡
水固堰。围堰方案确定前,分别对全年挡水围堰方案和汛期过水用堰方案过流情况进行了水工模型试验,根据模型
试验结果确定了二期固堰最终方案为汛期过水围堰方案。
关键词:蜀河水电站:挡水围堰:汛期:过水围堰:水工模型;试验
中图分类号:TV131.61
文献标识码:A
Study on Hydraulic Model Tests of River Diversion for Phase II Concrete Construction,
Shuhe Hydropower Station
WANG Jiang-tao
Shaanxi Hanjiang Investment Development Co.,Ld,Xi'an 710065,China)
Abstract:Transverse water-retaining cofferdams at both upstream and downstream of powerhouse foundation pit need to be built because
the completed flood discharge gate on right bank is applied for Phase II diversion so as to have dam sections at powerhouse of Shuhe Hy-
dropower Station be concreted.Before determination of scheme for cofferdam,hydraulic model tests on flows are carried out respectively
according to scheme for year-round water retaining cofferdam and scheme for overflow cofferdam in flood season.Based on the model test
results,the final scheme for Phase II cofferdam is the one for overflow cofferdam in flood season.
Key words:Shube Hydropower Station;water-retaining cofferdam;flood season;overflow cofferdam;hydraulic model;test
堰分为全年挡水围堰和枯水过流围堰2个方案。全
工程基本情况
年挡水围堰方案的上游堰顶高程为224.1m,最大
在预可研、可研及施工等阶段分别委托西北水
堰高34.1m,下游围堰堰顶高程213.7m,最大堰高
利科学研究所和中国水电顾问集团西北勘测设计研
23.7m。枯水过流围堰方案中的上游围堰子堰顶高
究院等单位进行了水工整体及施工导流水力学模型
程217.7m,过流围堰顶高程203.0m,最大堰高
试验1-。
27.7m,下游围堰子堰顶高程208.2m,过流围堰顶
本水电站施工导流设计采用河床分期分时段导
高程202.0m,最大堰高18.2m。
流方式:一期采取枯水期围堰围护施工混凝土纵向
二期围堰设计洪水标准Q1o%=17000m/s(安
导墙,汛期采用纵向导墙与上下游横向围堰挡水,左
康水电站控泄后的流量),施工分期洪水详见表1。
岸河床过流:二期施工围堰由左岸上、下游围堰及混
导流建筑物型式及混凝土纵向导墙特性见表2。
凝土纵向导墙挡水,泄洪闸及升船机坝段过流,进行
二期基坑厂房坝段施工。二期河床基坑上游土石围
2试验目的、要求及内容
2.1试验目的