Abstract: The jacking force is a major constraint on long distance pipe-jacking. With the pipe-jacking project of the
largest diameter and meanwhile the longest distance domestically-- the Shanghai sewage treatment of Bailonggang
pipe-jacking project, Section 2.2, this paper explores and discusses some key technical measures to control jacking
force during project construction, such as rear backrest construction technology, relay ring construction technology,
and drag reduction grouting construction technology, accumulating experience for similar pipe jacking construction.
Keywords: super large diameter concrete pipe jacking force control rear backrest relay ring
grouting drag
reduction
1工程概况
面失稳。场地地下水埋藏较浅,地下水对顶管施工影响很
上海市污水治理南线输送干线完善工程采用项管法施
大。浅层潜水由于顶管开挖出土所产生的水头差而渗流,
工,敷设采用平行双管的方式,总长约52 km。该工程管道导致粉性 土产生流砂,对顶管施工不利。
内径4 000 mm,外径4 640 mm,管材为钢筋混凝土,每节
管的长度为2.5 m。该工程为目前国内最大直径的钢筋混凝
迎寅卫工作井”
土顶管工程,其SST2.2标为外环8"井~迎宾3"井之间的顶管
外环8工作用外环1接收井
工程,该标段其中1个顶进段单级项进长度达2039.82 m,
为同直径下最长距离的项管工程,如图1所示。
比线2035.69m
南线2 039.82 m
本工程顶管覆土厚度约为6~12 m,覆土浅薄处为穿
北线103.6m北线8450m
全长7 890.71 m
越河浜及沟渠处。顶管所穿越的主要土层为④层淤泥质黏
土及⑤1灰色黏土,该土层分布稳定,厚度较厚,但土质
图1工程示意
较差,呈流塑状。其强度低、渗透性差、高压缩性、高灵
敏度、具触变性和流变性、施工易受扰动,容易导致开挖
2圆形 工作井后靠背制作施工技术
2.1圆形工作井后靠背设置重要性
。
后座所能承受顶力的大小制约着长距离顶管顶进的距
*注:本项目为上海市杨浦区人才发展专项资金(鼎元资金)和
离。一般情况下,以顶管节所能承受的最大顶力来验算顶
上海市科委资助项目,编号为12DZ2252300
作者简介:李耀良(1962-) ,男,本科,教授级高级工程师。
管工作井的后座是否能承受该最大顶力的反作用力,在顶
通讯地址:上海市杨浦区民星路231号 (200433)。
管施工的过程中严禁超过总顶力的情况发生。在顶管施工
收稿日期: 2013-12-23
中,通过在井内浇筑1堵后座墙来使油缸顶力的反力均匀
因本站资料资源较多,启用了多个文件服务器,如果浏览器下载较慢,请调用迅雷下载,特别是超过了5M以上的文件!请一定调用迅雷,有时候速度就会飞起哦,如果您的浏览器自动加载了PDF预览,文件太大又卡死,请按下载说明里的把PDF插件关闭了就可以直接下载,不会再预览了!