越南松邦 4水电站采用碾压混凝土大坝,工程具有资金不足、材料供应短缺、合同条件 苛刻、工期紧、施工条件复杂等特点。为保证工程按期完工,承建施工方采取对骨料加 工、混凝土拌制、混凝土人仓、单仓浇筑高程、模板制安等进行优化配备,旨在与碾压混 凝土筑坝工艺相匹配 ,力求简便 、经济,从而达到混凝土快速施工的目的。 关键词:碾压混凝土;施工方案;优化配置 ;快速施工;越南松邦 4大坝 中图分类号 :TV544.921 文献标识码 :A FastConstruction SchemeofRollerCompacted ConcreteDam for Songbang No.4 Hydropower Station in Vietnam 7HlIx an一1n (HydrochinaNo.8EngineeringBureauLimitedCorporation,Changsha410007,China) Abstract:TVietnam Songbang No.4 Hydropower Station is a roller compacted concrete dam.The constructionisfeaturedbyfund and materialsho~age,strictconditionsin thecontract,tightconstruction schedule and complicated constru ction conditions.In order to complete the construction on time, contractoroptimized aggregateprocessing,concretemixing,concretepouring,singleplacementelevation, manufactureand installationoftemplatein ordertomatch theRCC dam constructionprocess,and realize fastconstru ction with simpleand cost·savingmethod. Key words:roller compacted concrete;construction scheme;optimal allocation;fast construction; Vietnam Songbang No.4 Dam 1 工程概 况 本项 目建在越南 VuGia河的支流 Bung河上 ,位 于 QuangNam省 NamGiang区 TaBHinh和 ZuoiH公 社境 内,距离 DaNang市西南 5km。 该项 目主要 为 国家 电 网提供 能 源 ,装 机容 量 155MW,年发 电量58625万 kW ·h。工程施工分为 4个标段 ,分别为渠首施工图与土建施工 、水路施工 图与土建施工 、金结采购与制安 、厂房机 电设备采购 与制装标段 ,其中渠首施工图与土建施工、水路施工 图与土建施工 ,通过 国际招标 由中 国水电建设 集团 中标承建 ,工程管理由英 国麦克唐纳咨询公司负责。 根据设计 图纸 ,挡水建筑 物为碾 压混凝 土重力 坝,大坝底部高程 EL116m,顶部高 EL229m,最大
因本站资料资源较多,启用了多个文件服务器,如果浏览器下载较慢,请调用迅雷下载,特别是超过了5M以上的文件!请一定调用迅雷,有时候速度就会飞起哦,如果您的浏览器自动加载了PDF预览,文件太大又卡死,请按下载说明里的把PDF插件关闭了就可以直接下载,不会再预览了!