通过 两个工程 实例 ,借鉴深厚覆盖层上混凝土面板堆石坝坝基防渗处理理念并结合混凝土面
板堆石坝改善不良地形地质缺陷所采用的高址墙等新的筑坝技术 ,介绍了将上游围堰与混凝土面板堆
石 坝坝 体相 结合 的 混凝 土 面板 堆石 坝新 的 结构 型式及 其 上游 围堰设 计 的基本 要 求 。
关键 词 :混凝土 面板 堆石 坝 ;上 游 围堰 ;围堰 与坝体 相 结合 ;筑 坝技 术 ;新 疆
中图分类号 :TV641.4(245) 文献标识码 :B 文章编号 :1000—0860(2012)09—0039—04
An innovation and practice of design of concrete face rockfill dam in narrow valley
W ANG Yang
(Xinjiang Survey and Design Instiute of Water Resources and Hydropower,Urtimqi 830000,Xinjiang,China)
Abstract:Through two cases of actual projects,a new structural pattern of concrete face rockfill dam based on the combination
between upstream cofferdam and the dam body is described herein along with the basic requirement on the design of its upstream
cofferdam by the reference from the concept of the anti—seepage treatment on the foundation of the concrete face rockfill dam on
deep overburden and in combination with the new dam construction techniques such as high toe wall, etc.adopted for improving
the geological defects of poor topography for construction of the dam.
Key words:concrete face rockfill dam ;upstream cofferdam;combination between coffer dam and dam body;dam construction
technique;Xinjiang
1 问题的提出
1.1 新疆 混 凝 土面 板 堆 石坝 导 流 系统 的 设计 与 施 工
特点
新疆河流径流补给是以高山区永久积雪和冰川消
融为主要补给源 ,河流全年来水量 的 60% 以上集 中
在 6月 、7月 、8月这三个 月中。新疆 的气候 特点是
冬季严寒且时间长 ,每年 11月至次年 3月平均气温
低于 5.0 cc,每年有效施工工期较短。
受新疆气候条件和水文特性的制约 ,工期安排一
般是 :汛期过后 9月份河道截 流,11月份进入冬季 ,
第二年 4月份可正常施工 ,5月份进人桃花汛,6月
份进入主汛期 ,河道截流后到第二年汛前有效施工工
期较短 ,故新疆地区混凝土面板堆石坝的上游 围堰多
采用全年围堰 。
W ater Resources and Hydropower Engineering Vol 4, No.9
1.2 狭窄河谷中混凝土面板堆石坝上游围堰采用全
年 围堰存在 的 问题
由于河谷狭窄 ,施工期上游 围堰 的调蓄 能力 较
差 ,导致上游围堰较高和导流洞规模较大 ,在后期将
导流洞改建成泄洪洞 时,导流洞断面不能充分利用 ,
枢纽布置也不紧凑 。另外 ,狭窄河谷 中部面板 向上游
延伸较远 ,面板整体体形不好 ,同时狭窄河谷 中趾板
布置相对困难。
2 降低导流系统规模优化枢纽布置的新思路
为克 服混 凝土 面板 堆石 坝采 用上 游全 年 围堰所 带
来的不利影响,结合 目前深厚覆盖层上修建混凝土面