通过相关的工程案例,分析 了堆石混凝土筑坝新技术 的发展轨迹,并提 出了新 的研 究课题 ,
希望给技术使用者提供帮助,给机械、材料研 究者一些技术思路 。
关键 词 :堆石 混凝 土 ;发展 ;工程 案例 ;研 究课题
中图分类号 :TV641 文献标识码 :B 文章编号 :1000—0860(2012)07—0010.04
New development of rock-filled concrete dam construction technology in China
PAN Ziheng , ZHANG Chunxia
(1.Nanyang Survey and Design Institute of Water Resources,Nanyang 473000,Henan,China;
2.Water Cuhnre Research Center of Beijing Journalism and Cuhure Research Institute,Beijing 100083,China)
Abstract:Based on the cases of the relevant construction projects,the development track of the new technology of rock—
filled concrete dam construction is analyzed,and then some new study subjects are put forward herein,SO as to give related
assistance to the users of the technology and provide some technical concepts for the researchers of the machineries and ma—
terials concerned.
Key words:rock-filled concrete dam;development;project case;study subject
1 引 言
堆石混凝土技术 (Rock.filled Concrete,RFC)…
在 2010年之后 的发 展速度 超过 了前 7年 ,使 用项
目数量 和方 量 ,翻 了好 几倍 ;使用 部 位 也 开始 从
2005年 前后 的临 建部 位 、加 固项 目发展 到 了现 在 的
在主坝建设上应用 。应用范 围与解决方案也扩展到
了堤防和挡土墙 、回填 工程 、固废资源化利用 、岩
基处理等。
2 各具特点的堆石混凝土坝
2.1 河 卵石 做 堆石 料 采 用防 渗面 板与 坝体 一 次性 成
型 项 目— — 吉利水 电站 溢流坝 工程
2.1.1 工程概 况
吉利水 电站位于甘肃省康乐县莲麓 乡的洮 河干
流上 ,最大坝高 14.6 m。工 程 主体 于 2009年 3月
开工建设 ,计划 于 2012年 上半年 实现首 台机 组投
产发 电。201 1年 3月至 6月进行溢流坝堆石混凝土
技术 施 工 。
10
2.1.2 堆石 混凝 土施 工技 术 两项创新
吉利水电站因人工费用 的不断上涨和工期的要求
使原设计方案 中溢流坝现浇 C15埋石混凝土坝体方
案实施起来较为困难 。设计结合本工程枢纽布置的特
点、现场施工条件 ,并充分考虑工程建设的经济性 ,
在 本工程 枢 纽 右 岸 溢 流 坝 段 采 用 堆 石 混 凝 土 技 术 建
坝。该项 目充分利用了当地河卵石作为堆石料 ,降低
了施工成本 ,并且采用防渗面板与坝体一次成型 ,简
化了施工程序 J。
2.2 取 消 温控 措施 减 少人 为干 预成 为 减碳 样 板项 目
— — 清 峪水库 工程
2.2.1 工程概 况
清峪水库地处 山西省 临汾市 乡宁县 ,是一 座以
城镇生活及 工业供水为主兼顾农业灌溉 的小 (1)型
水库 ,设计为堆石混凝土重力坝 ,坝高 42.6 m,水
库总库容 233万 m。。混凝 土浇筑量 约 7万 m ,除