您好,欢迎来鲁班袋建筑工程资料库!
您当前的位置:首页 > 工程书籍 > 混凝土系列
龙湾水库除险加固工程塑性混凝土防渗墙应用
  • 资料大小:150KB
  • 资料类型:.PDF
  • 资料等级:
  • 发布时间:2021-10-08
资料介绍

纪透水层没作处理 ,坝基渗漏一直是影响水库安全运用的主要问题。龙湾水库采用塑 性混凝土地下防渗墙对坝基渗漏进行处理,收到了较好的效果。文章介绍了施工的主要方法 和工序 。 关键词:塑性混凝土 ;防渗墙 ;土坝;除险加固;施工方法 中图分类号 :TV543.8 文献标识码 :B EngineeringApplication ofPlasticConcreteAnti-seepageW all in Longwan ReservoirReinforcem ent LIU Shuo (1iaoningProvinceHeishanCountyWaterConservancySurveyD~ignTeam,Heishan 121400,China) Abstract:Longwan reservoirofHeishan Countywasbuiltin 1958,and itiSamedium-sized reservoir forflood controland irrigation.Because the dam foundation quaternary permeable layer did notbe treated,the dam foundation seepage hasbeen the main problem afecting the safety ofreservoir.The plastic underground concrete anti-seepage wall of dam foundation seepage treatment is adopted in Longwan reservoir,havingreceivedgoodresults.Thispaperintroducesthemainmethod andtheprocess ofconstruction,forsmallandmedium—sizedreservoirreinforcementprojectreference. Key words:oncrete;anti-seepagewall;Earth dam ;dangercontroland reinforcementc 1 概 述 黑山县龙湾水库始建于 1958年 ,是一座 以防洪 灌溉为主的中型水库。由于建库 时坝基第 四纪透水 层没作处理 ,坝基渗漏一直是影 响水库安全运用 的 主要问题。近年来 ,塑性混凝土 防渗墙经过众 多的 工程实践 ,其施工工艺 、墙体材料 、检测方法、机械设 备等已成熟 ,且 由于其墙体 强度高 ,性能稳定 ,在运 行过程 中允许一定的变形 ,使用年限长,在土坝除险 加 固中得到广泛应用。在龙湾水库除险加 固工程坝 基渗漏处理方案 比较中 ,首选了该方案。 龙湾水 库 除险加 固工 程于 2009年开工 ,处 理 主、付坝基础渗漏段长度857m,造槽孔 l18个,成墙 面积 14117m ,经 过 运 用 ,防 渗 效果 达 到 了设 计 要求 。 2 工程主要设计要求和指标 2.1 工程主要设计要求 防渗墙中心轴线设在坝迎水坡 ,平行坝轴线 ,墙 体厚度40cm,最大槽深27.88m,防渗墙体嵌入微风 化 .5m。 2.2 墙体塑性混凝土性能指标

温馨提示

因本站资料资源较多,启用了多个文件服务器,如果浏览器下载较慢,请调用迅雷下载,特别是超过了5M以上的文件!请一定调用迅雷,有时候速度就会飞起哦,如果您的浏览器自动加载了PDF预览,文件太大又卡死,请按下载说明里的把PDF插件关闭了就可以直接下载,不会再预览了!

友情链接: ArchiName筑名导航 孙悟空

网站首页 | 关于我们 | 服务条款 | 广告服务 | 联系我们 | 网站地图 | 免责声明 | WAP
Powered by lubandai.com © 2009-2016 Inc. 桂ICP备16008802号
资源报错、业务联系及其它事务请发邮件与我们联系:admin@lubandai.com