混凝土面板堆石坝面板压性缝监测设计探讨
陈树联,顾永明
(中国水电顾问集团西北勘测设计研究院,西安710056)
摘要:随着对面板堆石坝面板挤压问题认识的不断提高,目前常用的监测手段已无法满足面板挤压监测的要求。
文章将面板压性缝的压缩变形分为了3个阶段,并提出了挤压监测的新手段,为以后高面板堆石坝压性缝监测设计
提供了参考。
关键词:面板堆石坝;安全监测;面板;接缝变形;压性缝;挤压
中图分类号:TV641.43;TV698.11 文献标识码:A
Study on monitoring design of compressive joints of concrete faced rockfill dam
CHEN Shu~lian,GU Yong—ming
(Hydrochina Xibei Engineering Corporation,CHECC,Xi'an 710056,China)
Abstract:W ith increasing awareness on the face slab compressive issues of concrete face rockfill dam ,the common monitoring means ap·
plied now cannot meet the requirements on the monitoring of the face slab compression.In this paper,the compressive deformation of the
face slab compressive joint is divided into three stages,proposing the new monitoring means accordingly.This study provides reference for
monitoring design of compressive joints of high concrete face roekfill dam
Key words:concrete faced rockfill dam;safety monitoring;face slab,joint deformation;compressive joint;press
0 前 言
混凝土面板堆石坝是以堆石体为支承结构、并
在其上游表面设置混凝土面板作为防渗结构的一种
堆石坝。从1895年美国建成54 m高的Morena坝
至今,混凝土面板堆石坝的建设和发展经历了一个
多世纪的发展历程,其设计和施工方法日趋成熟,在
世界范围内的应用也日益广泛,面板堆石坝逐渐成
为一种极富竞争力的土石坝坝型⋯ 。
早期的面板堆石坝均属于中低坝,坝体内部未
安装任何监测仪器,仅通过表面测量和人工巡视方
法掌握变形状况,所获得监测成果为后期面板堆石
收稿日期:2011-08-22
作者简介:陈树联(1963一),男,高级工程师,主要从事大坝安全
监测方面的工作.
顾永明(1980一),男,工程师,主要从事大坝安全监测方面的工
作.
坝发展积累了一些经验。进入20世纪60年代,位
移监测开始应用于坝体内部;进入90年代,面板堆
石坝监测技术进一步成熟。中国在“七五”、“八
五”、“九五”期间对面板堆石坝的安全性进行了重
点研究,在大坝内埋设了大量的监测仪器,取得了较
大成绩,为现在的面板堆石坝技术作出了重大的贡
献 。
随着面板堆石坝技术的不断发展,面板堆石坝
的坝高不断增大;国内外相继设计、建造了一批坝高
大于150 m,甚至200 ITI以上的高面板堆石坝工程。
坝高增加的直接后果就是堆石体应力水平的增加、
坝体及面板承受水压力的增大,以及混凝土面板长
度的增加。由于堆石材料的高度非线性特征,其在
高应力条件下的应力变形特性对于坝体和面板的变
形性态有着至关重要的影响,而混凝土面板在