黄河公伯峡水电站左岸泄洪洞
混凝土施工结构缝及裂缝渗漏的处理
刘关华,高雄
(中国水利水电第三工程局有限公司,西安710016)
摘要:分析黄河公伯峡水电站左岸泄洪洞混凝土施工结构缝渗
结构伸缩缝和裂缝均达到不渗漏盼效果;施工质量满足设计要求。
关键词:泄洪洞;结构缝;裂缝;化学灌浆 ;公伯峡水电站
中图分类号:TV544 文献标识码 A
及产生裂缝原因,对渗漏进行化灌处理,处理后的
Treatment of crack seepage in concrete structural joints of spillway tunnel
on the left bank of Gongboxia hydropower station
LIU Mei-hua,GAO Xiong
(Sinohydro Engineering Bureau 3,Xi"an 7 10016,China)
Abstract:The paper analyzes the crack seepage in concrete structural joints of the spillway tunnel on the left bank of Gongboxia hydro—
power station on the Yellow River and the causes of cracks.Chemical grouting was carried out against the seepage,and no leakage occurs
in the structural expansion joints and cracks after treatment.The construction quality satisfies the design requirements.
Key words:spillway tunnel;structural joint;crack;chemical grouting;Gongboxia hydropower station
1 工程简介
黄河公伯峡水电站左岸泄洪洞由进水口引渠进
水塔、压力隧洞、工作闸室、泄槽及护岸等部分组成,
建筑物全长1 105.483 m。压力隧洞全长607 m、由
进、出口渐变段和洞身段组成,其中进、出口渐变段
长各为20 m,洞身段长567 m。混凝土衬砌后洞身
直径为8.5 m,衬砌断面按围岩的类型有3种:I类
型衬砌断面厚度为60 cm,布设单层钢筋;1I类型衬
砌断面厚度为80 cm,布设双层钢筋;Ⅲ类型衬砌断
面厚度为100 cm,布设双层钢筋。混凝土浇筑分段
长度一般为9.0 m和9.2 m。
2 工程地质条件
沿公伯峡水电站左岸泄洪洞洞轴线地形起伏变
化大,穿越三梁两沟,冲沟无常年流水,仅在暴雨季
收稿日期:2011-09-20
作者简介:刘美华(1957'),男,陕西省紫阳县人,高级工程师
从事水利水电工程施工管理工作.
节可汇聚成洪流。沿线地表基岩裸露,覆盖岩体厚
度为80~1i0 m,局部过沟段及跨溢洪道堰闸基础
段较薄,为22—60 m。左泄0+15 m~左泄0+105 m
段岩性主要为片岩,其次为脉状花岗岩及花岗伟晶
岩脉,与围岩接触不好,该段岩体中裂隙发育。左泄
0+105 m一左泄0+330 m段主要为花岗岩,间夹少
量片岩、片麻岩捕虏体,侵入面接触不良,花岗岩为
中、粗粒花岗结构,块状构造;山梁表部有厚约20~
25 m的第三系砖红色砾砂岩。左泄0+330 m~左
泄0+622 m段岩性主要为片岩,其次为花岗岩及片
麻岩,片岩中多有花岗岩脉穿插,脉带宽一般0.2~
0.5 m,最宽可达3.0 m,与围岩接触不好。隧洞围
岩整体结构性一般。
3 混凝土施工结构缝渗漏及产生裂缝
的原因
公伯峡水电站左岸泄洪洞混凝土施工结构缝产
生渗漏以及衬砌脱模后产生裂缝。
3.1 混凝土施工结构缝渗漏原因
(1)结构缝附近,在混凝土施工过程中出现漏