光照高碾压混凝土坝的设计理念与
实践总结
雷声军,陈毅峰,陈能平,龙起煌,王洪军
(中国电建集团贵阳勘测设计研究院有限公司,贵州贵阳550081)
摘 要:光照大坝是世界上第一座坝高超过200 m的碾压混凝土重力坝,工程仅花费2年时间就浇筑至坝顶高程,
至今大坝已安全运行五年多。回顾光照大坝的设计历程, “安全可靠、布置简捷、工艺简单、经济节约” 的设计理
念贯穿整个建设过程,有诸多优化设计及技术创新值得总结与推广,例如泄水建筑物取消左侧底孔、精简交通系统、
优化碾压混凝土配合比、高掺Ⅱ级粉煤灰等。
关键词:碾压混凝土重力坝;设计理念;总结;光照水电站
Sununary on Design Ideas and Practices of Guangzhao High RCC Dam
LEI Shengjun,CHEN Yifeng,CHEN Nengping,LONG Qihuang,WANG Hongjun
(PowerChina Guiyang Engineering Corporation,Guiyang 550081,Guizhou,China)
Abstract Guangzhao Dam is the first RCC gravity dam over 200 m in the world.The construction of dam only spends two
years and the safe operation of dam has been more than five years.The ideas of“Safe and reliable,Simple layout,Simple
pouting process,Economical”are applied in whole design process of dam.Many design optimization and technologies are
innovated,for example,the left bottom outlet of discharging structures being cancelled,transportation system simplification,
mix proportion optimization of RCC and application of high content Grade-II fly ash.
Key W ords:roller compacted concrete gravity dam;design idea;summary;Guangzhao Hydropower Station
中图分类号:TV642.2(273) 文献标识码:B 文章编号:0559-9342(2014)07-0045-04
1 工程概况
光照水电站位于贵州省关岭县和睛隆县交界的
北盘江中游。是北盘江干流的龙头梯级电站。水库
总库容32.45亿nl .水库正常蓄水位745 Ill, 为不
完全多年调节水库。电站装机1 040 Mw 。光照水电
站为I等大(1)型工程,工程枢纽由挡水坝、坝身
泄洪系统、右岸引水系统及地面厂房等组成。大坝
为碾压混凝土重力坝,最大坝高200.5 in, 坝顶长
410 ITI。大坝混凝土浇筑总量约280万m ,其中碾
压混凝土约242万m 。大坝于2006年2月l1日开
始浇筑,2008年2月6日浇筑至坝顶高程。
光照大坝是目前世界上已建成最高的碾压混凝
土坝.至今良好运行5年多,该工程以其快速施工、
质量优良而获得了国际RCC里程碑奖、国家优质工
程金质奖、全国工程建设项目优秀设计成果一等奖、
全国优秀水利水电工程勘测设计金质奖等一系列荣
誉。回顾工程的设计历程,从总体布局到细部结构
上都充分体现了“安全可靠、布置简捷、工艺简单、
经济节约” 的设计理念, 本文总结光照大坝建设中
的一些优化设计方案,对其他工程提供借鉴。
2 设计理念与实践总结
2.1 安全可靠
(1)所选坝址地质条件优越。施工阶段开挖基
岩证实该坝址是一个不可多得的好坝址。坝基为永
宁镇组灰岩, 岩石平均湿抗压强度40~65 MPa, 变
形模量9~13.5 GPa. 声波波速4 500~6 100 m/s, 建
基面岩体质量和均匀性较好,两岸坝基开挖深度
(嵌深)为15~25 m,河床坝基最小开挖深度仅8 Ill