观音岩水电站右岸碾压混凝土斜层施工工艺
王 玮,王朝阳, 罗 斌
(中国人民武装警察部队水电第一总队,广西南宁 530028)
摘要:本文主要介绍了观音岩水电站右岸碾压混凝土斜层施工工艺、37艺流程及经济性分析
, 阐述
了施工中斜层面上骨料分离及坡脚处骨料集q-等问题的处理方法。
关键词:观音岩水电站;碾压混凝土;斜层;坡脚处理;经济性
中图分类号:TV544.921(271) 文献标识码:B 文章编号:1000—0860(2011)05—0068 03
Inclined layer construction technology for RCC placement on right bank of Guanyinyan Hydropower Station
W ANG W ei,W ANG Chaoyang,LUO Bin
(The No.1 General Team of AmwA Police Hydropower Troops,Nanning 530028,Guangxi,China)
Abstract:The inclined layer construction technology
, process flow and economy of the roller—compacted concrete(RCC)on the
right bank of Guanyinyan Hydropower Station are mainly described herein
, and then the treatment methods for the problems such
as aggregate separation on the surface of the inclined layer and the aggregate concentration at the toe of the slope during the construction
are explained as wel1.
Key words:Guanyinyan Hydropower Station;roller—compacted concrete;inclined layer;treatment on slope toe;eeonomy
1 工程概况
观音岩水电站位于金沙江中游河段,上游与鲁地
拉水电站相衔接。站为I等大(1)型工程,以发电为
主,兼有防洪、灌溉、旅游等综合利用功能。水库正
常蓄水位1 134 In,库容约20.72亿113 ,电站装机容
量3 00O(5 X 600)MW。本合同工程碾压混凝土主要
分布在(12个坝段,24 ~35 )约122万1TI 。
2 斜层施工的必要性
由于观音岩水电站35 坝段高程l 017 in以下为
长条形仓面,入仓方法为自卸汽车自坝后人仓道路
直接人仓,因混凝土运距较远,仓面顺水流方向距
离长,若利用平铺法沿水流方向施工垂直方向碾压
工作面混凝土的层间间隔时间将延长,增加了质量
控制的难度,对高坝碾压混凝土来说,层面结合质
量和抗剪强度要求很高,采用斜层浇筑,缩小了铺
筑层层面面积,缩短了层问间隔时间,在质量控制
上有重要的意义,层间问隔时间若太长,即使采用
严格的层面处理措施,也难达到直接铺筑时的抗剪
断强度指标。
采用斜层浇筑,有以下优点:
(1)采用斜层浇筑,缩短了层间间隔时问,而不
必高掺量的高效缓凝剂以延长混凝土初凝时间,降低
了混凝土的费用。
(2)采用斜层浇筑,减少了层面处理的工序,
减少拌和楼拌和混凝土压力,减少层面结合铺砂浆
难以保证质量的压力,从而提高混凝土的层间结合
力。
(3)斜层铺筑法的作业面积可以比较小,覆盖时
间较短,对高温季节施工的温控混凝土,可以减少温
度倒灌、喷雾等措施也易于实施。若遇降雨,由于斜
坡面的存在,也可以降低雨水对新浇碾压混凝土的侵
害。高温多雨季节,宜采用斜层施工方法进行混凝土
浇筑,利用斜层的面积相对较小、层间间隔时间段、
暴露作业面积小等特点。