大型水电工程混凝土骨料料源选择的思考
李太成,佘 奎,常作维,陈惠明
(中国水电工程顾问集团公司,北京100120)
摘要:根据近年来水电工程建设实践,对大型水电工程混凝土骨料料源选择中的若干问题进行了总结。提出混凝
土骨料料源选择应在加深地质勘察和相关试验工作的基础上,通过深化研究,最终选择储量足够、原岩性能良好、
易于加工、开挖料利用恰当、开采运输合理的料源方案。
关键词:水电工程;混凝土骨料;料源选择
Reflections on Concrete Aggregate Material Source Selection for Large-scale Hydropower Projects
Li Taicheng,Yu Kui,Chang Zuowei,Chen Huiming
(HydroChina Corporation,Beijing 100120,China)
Abstract:The issues relating to concrete aggregate material source selection for large-scale hydropower projects are studied
after learning from the engineering practices in recent years.It is proposed that the material souse programs wi血suficient
reserve,good rock performance,easy processing,rational use of excavated materials and convenient excavation and transport
should be selected on the basis of detailed geological su~ey,scientific tests and research.
Key Words: hydmpower project;concrete aggregate;material source selection
中圈分类号:W741; Ⅳ42 文献标识码:A 文章编号:0559—9342(201i)10--0048-03
近年来, 在国内一些大型水电工程实施阶段,
由于各种原因,在混凝土骨料料源储量质量、加工、
开挖料利用、料源开采和运输等方面出现了不同程
度的问题,有的甚至出现了料源方案的重大调整,
对工程建设造成了影响。
1 料源储量和质量
大型水电工程建设表明, 料源储量和质量随着
勘探、试验工作的深入,及实际开挖进展, 可能会
发生较大变化,甚至会发生重大变化,对料源选择
和利用造成较大影响。
锦屏一级工程兰坝大理岩料场在可研阶段探明
有效储量为870万m .其储量和质量均满足要求。
招标设计阶段加深了勘探工作。发现其开采条件变
差,有用料分布范围和储量均发生了巨大变化, 可
采储量仅为109.1万m ,不得不放弃其作为主要料
场。实际采用了质量相对较差的三滩大理岩料场。
锦屏二级东端工程招标阶段混凝土总量为200
万m 。工程实施阶段, 由于设计变更、超挖、地质
条件变化等因素, 混凝土总量增加了150万m .料
源缺口200多万1TI ,后来通过锦屏一级工程三滩大
啊WarerPo er Vo1.37No. o
理岩料场扩大用料得到解决。
向家坝工程可研阶段起初将料场选在离坝址约
18 km 的双河料场,后经详细勘探, 发现其中有一
半岩层有碱碳酸盐活性反应而放弃。随后考虑过坝
址附近的新滩坝砂岩,其缺点是强度偏低,加工易
破碎,石粉含量高,此外剥采比也高,约为1:1,并
存在碱硅酸盐活性反应, 只好放弃。最终不得不舍
近求远.选定各项性能良好、运距近40 km 的太平
料场灰岩。
漫湾工程可研阶段对花岗岩料场勘探较少,认
为风化层较薄,推荐花岗岩作为一号料场。在开采
了60万m 以后.才发现山顶风化层太厚. 而被迫
放弃。
小湾工程选择孔雀沟石料场llI料区作为拱坝骨
料主料源,规划开采量900万m’。料场开采后发现
G1挤压破碎带及其下盘岩体的破碎、蚀变、风化程
度超过了预期,无用料的比例较高, 同时设计混凝