采用混凝土柱支撑后浇带梁板施工工法
郑 琴,邹 超
(方远建设集团股份有限公司,310012,杭卅I)
摘要:在混凝土后浇带施工中采用混凝土柱支撑取代传统的扣件式钢管支撑,提高了后浇带支撑模板
与支架的周转率,经济效益较好,且施工操作空间开阔,并可优化场容场貌,符合绿色施工要求。
关键词:现浇混凝土;梁板工程;施工缝;模板支撑
中图分类号:TU 755 文献标志码:B 文章编号:1000—4726(2015)12—1116—02
CoNSTRUCTIoN M ETHoD oF CoNCRETE COLUM N SUPPORTED
PoST_CAST BELT BEAM SLAB
ZHENG Qin.ZOU Chao
(FangYuanConstructionGroupCo.,Ltd.,310012,Hangzhou,China)
Abstract: During construction of post-cast concrete belt,traditional fastener-type steel tube support
was replaced by concrete column to improve the turnover of post-cast belt support formwork and
realize favorable economic benefits.The construction space is wide and constru ction field conditions
could be optimized,sarislying the green construction requirements.
Keywords:cast—in-place concrete;beam slab project;construction joint;formwork support
按《混凝土结构设计规范》规定,大型结构须由
后浇带划分为若干部分,但后浇带采用传统的扣件式
钢管模板支撑体系存在如下问题:
(1)后浇带支撑架与周边架体留置时间不一致,
造成后浇带支撑架与周边支撑体系关系复杂;
(2)后浇带支撑架留置时I司长,占用钢管和模
板多,不能高效周转而造成浪费;
(3)扣件式支撑体系架体庞杂,占用施工空间,
影响场容。为解决上述问题,我公司开发了混凝土柱
收稿日期:2015—09—05
作者简介:郑琴(1988-),女,浙江衢州人,e—mai1:848815080@
qq.COIIl·
支撑后浇带梁板施工工艺,替代传统施工工艺。
1 工艺特点及原理
I.I 工艺特点
混凝土柱支撑后浇带梁板体系适用于设有后浇带
的所有的有梁地下室顶板、框架或框一剪楼盖、屋面
等。其施工工艺流程为:基底面清理一柱定位一预制
钢筋柱骨架一支立柱两边模板一柱骨架就位一浇混凝
土一拆除再利用。
工艺特点如下:
(1)采用现浇混凝土柱支撑被后浇带分割成悬
臂梁的悬臂端,间距由板沿后浇带方向跨度控制;
。 e鹳 e ∞ 啦 0 0 e— 0 0 。 气e 0 0 0气e c—
舍等用房不超过建筑面积的10%等。6)应全面了解
周边道路情况,由于主要货运均为大货车,需进行车
流量分析;7)计算人员编制,以便合理设计办公、
宿舍、食堂、洗浴等配套建筑及构筑物;8)原则上
货运出入口和人员出入口应分开设置,生活办公区与
厂区应分开设置以便管理,并减少生产对生活办公的
影响;9)充分考虑场内运输与物流,进行物料平衡
计算和分析,设计合理流程,减少重复和交叉,以最
大程度降低成本。
(3)进行施工图设计。
(4)厂房建设与设备安装。
(5)试车与培训工作。
(6)正式运营后的技术改进、开发新产品以降
低成本、争取最大效益等。
3 结束语
建筑垃圾资源化利用项目必须以本地为中心,尽
量减少运输;对外地的经验不照搬,不教条;要因地
制宜、实事求是、突出地方特色,并充分利用当地现
有的各种条件,通过调整产业结构解决原料、土地、
生产企业、产品生产和应用等一系列问题。