变顶高尾水隧洞挂顶混凝土浇筑施工技术
周鹏涛
(中国水利水电建设工程咨询西北有限公司向家坝工程监理中心,云南省水富县657800)
摘要:向家坝水电站变顶高尾水隧洞体型巨大,地质条件复杂,实施挂顶混凝土浇筑,有效地抑制了洞顶围岩的
变形,同时也降低了后期钢模台车的施工难度,使施工的安全、质量和进度得到了保障。
关键词:变顶;高尾水;隧洞;钢模台车;混凝土;先拱后墙;安全监测
中图分类号:TV544;TV554 文献标识码:A
Technology on Concrete Placement of High Tailrace Tunnel with Varied Crown
ZHOU Pengtao
(Supervision Center of Xiangjiaba Hydropower Project,China Hydro Consuhing Engineering Corporation,
Northwest Branch,Shuifu,Yunnan 657800,China)
Abstract:The high tailrace tunnel with varied crown of Xiangjiaba Hydropower Project is large in scale,where the geological conditions
are complicated.Application of concrete placement of the crown effectively restrains the deformation of the surrounding rock of the crown.
Simuhaneously,this operation also reduces the construction difficulty in application of the form trolley,securing construction safety,qual·
ity and progress.
Key words:varied crown ;high tailrace;tunnel;steel form trolley;concrete;concrete placement of crown before wall;safety monitoring
1 工程概述
向家坝水电站是金沙江梯级开发中的最后一座
水电站,位于四川省与云南省交界处的金沙江下游
河段。工程开发以发电为主,同时改善航运条件,兼
顾防洪、灌溉,并具有拦沙和对溪洛渡水电站进行反
调节等综合作用。该工程右岸地下厂房尾水系统采
用2机1洞变顶高方案。
2 变顶高尾水隧洞的结构特点
变顶高尾水隧洞的起点在1、3号机闸门井后
28.90 m处,每2条尾水支洞接入1条变顶高尾水
隧洞。变顶高尾水隧洞采用城门洞形,出口底部高
程为244.00 m,出口顶部高程为278.O0 m。1号尾
水隧洞长263.78 m,开挖断面高度34.22~38.20
m;2号尾水隧洞长199.78 m,开挖断面高度35.10
~ 38.20 113;开挖宽度均为:22.3~24.3 m。尾水隧
洞混凝土衬砌后出口断面尺寸为20 mx34 m(宽×
收稿日期:2014—02—28
作者简介:周鹏涛(1986一),男,陕西省乾县人,助理工程师,从
事水利水电工程监趣工作.
高),变化范围(见图1)底部坡度为3% ,顶部坡度
为4% ,控制尾水洞的最大出口流速不超过4 m/s。
3 水文地质条件
变顶高尾水隧洞段洞身位于T; ~、T; 的缓
倾角岩层中,主要为厚~巨厚层的砂岩,除 顶
部岩层呈薄至中厚层状外,多呈厚层至巨厚层状,岩
体呈微风化~新鲜。围岩类型顶拱以Ⅱ~Ⅲ类为
主,边墙以Ⅱ类为主,局部节理裂隙发育段为Ⅲ类,
软弱夹层为V类。岩层中未见较大断层分布,出露
的层间破碎夹泥层主要有JC2—2和JC2—3。洞室顶
拱层状结构面与节理切割形成的柱状块体稳定性较
差,易出现洞顶掉块。尾水隧洞出口段位于强卸